Operating in bad weather condition

  • Client:CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
  • Cargo Capacity:60 tons
  • POL:Munich,Germany
  • POD:Tom Lasseter airport,Algeria
  • Transport:Freighter charter(IL-76)
  • Time:March,2010
  • Keypoint:Finishing two flights operation including packing,trucking and flight,during the timeof the heavy snow in Europe